List every planned garage load, including EV charging, tools, compressor, heat, lighting, doors, welder, freezer, and future equipment, then have an electrician evaluate the house service, feeder, subpanel, grounding, route, trench, and permit requirements together. A subpanel adds distribution space; it does not by itself increase the home’s service capacity.
Start with equipment, not a guessed panel size
The required design follows from equipment voltage, current, starting loads, simultaneous use, distance, and future plans. A garage used only for lights and receptacles differs from a heated workshop with EV charging, welding, a compressor, or other large loads.
Provide exact equipment specifications when available and distinguish equipment you own now from possible future purchases.
- EV charger and charging rate
- Electric or heat-pump heat
- Welder, compressor, and stationary tools
- Garage-door openers and lighting
- Refrigerator or freezer
- Outdoor and landscape circuits
Plan the route and site work
Distance, pavement, ledge, drainage, frost, landscaping, existing utilities, finished walls, and entry points can dominate the labor and restoration scope. The electrician determines the compliant route and coordinates required inspection timing.
If excavation is separate, the written scope should identify who marks utilities, digs, supplies conduit or bedding, schedules inspection before covering, backfills, compacts, and restores pavement or landscaping.
- Underground or overhead route
- Existing utility locations
- Trench and inspection sequence
- Building entry and panel location
- Snow, water, and vehicle exposure
- Restoration responsibility
A subpanel does not create service capacity
A subpanel creates additional distribution points but remains supplied by the property’s electrical system. The electrician must evaluate the existing service and calculated load, feeder, panel condition, and the other large loads in the home.
If several electrification projects are planned, compare feeder and load strategies together rather than sizing only for today’s one tool or charger.
Put boundaries in the written estimate
Clarify the feeder, panel, grounding, disconnect, circuits, receptacles, lighting, equipment connections, permits, trenching, wall repair, commissioning, labeling, and future provisions. Identify equipment supply and exclusions.
Detached garage: what drives the design and the price
| Factor | Why it matters | Put in the written estimate |
|---|---|---|
| Equipment list | Voltage, current, starting loads and simultaneous use set the design | Exact specifications, now and future |
| Route | Distance, pavement, ledge, drainage and frost can dominate labor | Underground or overhead, and who restores |
| Trench and inspection | Inspection must come before covering | Who marks utilities, digs, backfills and restores |
| Subpanel | Adds distribution space, not service capacity | Feeder, panel and grounding |
| House service | Must support the calculated load | Evaluation of existing service |
| Exclusions | Permits, trenching and wall repair may sit outside the electrical scope | Equipment supply and exclusions |
Questions
Common questions
Does a detached garage always need a subpanel?+
No. The design depends on the number and type of loads, distance, circuits, future plans, and applicable requirements.
Does a garage subpanel increase house amperage?+
No. It adds distribution but does not by itself increase the rating or available capacity of the main service.
Who digs the electrical trench?+
It may be the electrician, owner, or excavator. Put layout, inspection timing, materials, backfill, and restoration responsibility in writing.
How deep does a buried feeder to a detached garage have to be?+
Burial depth depends on the wiring method and whether it is direct-buried cable, conduit, or run under a driveway, and there are minimums for each. The electrician sets the depth to the method and the route, and the trench is typically inspected before it is backfilled, so confirm who calls that inspection.
Can I just run a heavy extension cord to the garage instead?+
No. A cord across the yard is a trip, weather, and overload hazard and is not a substitute for a permanent circuit or feeder, especially for anything beyond occasional light use. If the garage needs real power, a properly installed feeder or subpanel is the safe and lasting answer.
Does a detached garage need its own grounding electrode?+
A detached building fed by a feeder generally needs its own grounding electrode system and a disconnecting means, which is one reason a garage circuit is more than just pulling a wire. The electrician handles the grounding and disconnect requirements as part of the design.
What size feeder does a garage subpanel need?+
The feeder is sized to the loads you intend to run there, lighting and a few outlets is very different from a heater, an EV charger, or a workshop, plus the distance. List everything you might power in the garage, now and later, so it is sized once rather than undersized and redone.
Can I add an EV charger or a heater in the garage later?+
Only if the feeder and subpanel were sized for it, which is why it is worth naming those plans before the work rather than after. Telling the electrician about a future charger or heater now can mean a slightly larger feeder today instead of a second trench in a few years.
Sources
Sources
Programs and requirements can change, so check the linked authority before relying on a figure.
Request electrical service
Tell us what needs to be repaired or installed
Share the location, timing and any symptoms of detached garage subpanel Vermont that you can observe safely.