Information that changes the scope
- The heated area and the system's total wattage or amperage
- The existing service size and calculated load
- Whether it is an electric or a boiler-based hydronic system
- Control type: manual, timer, or automatic snow sensor
- Construction schedule and who installs the heating element
Where heated driveway and snowmelt systems fit
- A new or retrofit heated driveway, walkway, or step system
- Snowmelt or de-icing for a steep, shaded, or hard-to-clear drive
- A high electric load that may exceed existing service capacity
- Controls, sensors, and thermostats for automatic operation
- Coordination with paving, concrete, or masonry contractors
What a clear estimate should address
Snowmelt systems are large dedicated loads, so the scope should confirm the service can carry them, define the circuits, controls, and sensors, and coordinate the electrical rough-in with the paving or masonry work. Electric and hydronic systems place very different demands on the panel.