Information that changes the scope
- Which of the three utilities serves the address
- The system's size relative to that utility's net-metering thresholds
- Whether the Certificate of Public Good and the utility interconnection application have both been filed
- Existing panel busbar rating and whether it supports the interconnection method
- Whether the project also includes battery storage or a future battery pathway
Where solar interconnection work fits
- A new rooftop or ground-mount solar system needing to connect to the grid
- Adding a battery to an existing net-metered solar system
- A homeowner comparing net-metering credit terms before signing a solar contract
- A property changing utility service where an existing net-metered system is involved
- A group or shared net-metering arrangement among multiple parcels
What a clear estimate should address
Interconnection review should confirm which utility governs the project, whether the equipment meets the required interconnection standards, what the utility's own technical requirements add on top of the state process, and a realistic timeline for the utility's review: which runs on its own schedule, separate from the electrical permit and the installation itself.