Accessory dwelling units

Electrical planning for a Burlington ADU, backyard cottage, or garage apartment

An ADU electrical plan begins before rough wiring. The owner, designer, electrician, utility, and City need a consistent equipment list, occupancy plan, service and metering concept, permit sequence, and responsibility for every connection.
Plan earlyBefore equipment and walls
CoordinateCity · BED · trades
DocumentLoads through closeout
Start here

The practical answer

For a Burlington ADU, list all heating, water-heating, cooking, laundry, ventilation, alarm, lighting, receptacle, exterior, EV, and future loads before the electrical design is fixed. Coordinate zoning and construction approvals with electrical trade permitting, have the service and panel evaluated, confirm metering and utility questions with Burlington Electric Department, and assign rough inspection, wall closure, commissioning, and closeout in the project schedule.

01

Build one complete equipment schedule

An ADU may add space heating and cooling, domestic hot water, cooking, refrigeration, laundry, bath ventilation, smoke and carbon-monoxide alarms, lighting, receptacles, exterior equipment, and perhaps EV charging. Exact equipment reduces uncertainty; credible future loads help avoid designing only for move-in day.

The City’s ADU page describes ADUs within or on the same property as an owner-occupied single-family home and points owners to current zoning resources. Confirm that the proposed property and design meet current rules rather than relying on a general definition.

02

Settle service, panel, and metering questions

An electrician can evaluate the existing service, meter equipment, main panel, calculated loads, feeder, ADU panel, conductor route, and future priorities. Whether separate metering is desired or available is a utility and project question, not something to infer from a floor plan.

03

Sequence permits and inspections

Burlington’s current materials separate zoning, construction, and trade processes. Electrical rough work may need inspection before insulation and finishes conceal it. Put permit applicant, fees, inspections, correction responsibility, access, and final closeout on the project schedule.

04

Coordinate every trade boundary

The electrical estimate should identify utility coordination, HVAC power and disconnects, water-heater circuit, appliance connections, ventilation, alarms, site lighting, trenching, data, equipment startup, and finish repair. Name who supplies and connects each item.

  • Approved plans and current permit status
  • Complete appliance and mechanical schedule
  • Service, feeder, panel, and metering concept
  • Rough, insulation, drywall, and final sequence
  • Owner-supplied fixtures and devices
  • Testing, labels, manuals, warranties, and completion records

ADU electrical planning: sequence and boundaries

ItemWhat to settleWhen
Equipment scheduleHeating, water heating, cooking, laundry, ventilation, alarms, exterior and EV loadsBefore the design is fixed
Service and panelExisting service, meter equipment, feeder and ADU panelElectrician evaluation
MeteringWhether separate metering is desired or availableConfirm with BED
Zoning and construction approvalThe City's ADU page describes ADUs on the same property as an owner-occupied single-family homeConfirm current rules before design
Rough inspectionBefore insulation and finishes conceal the workOn the project schedule
Trade boundariesHVAC power, water-heater circuit and appliance connectionsName who supplies and connects each

Questions

Common questions

Does a Burlington ADU need its own electric meter?+

Whether an accessory dwelling is separately metered or fed from the main service is a design and utility question that depends on the layout, the loads, and how the units will be billed. Have the electrician and BED review the actual project, because the metering decision shapes the panel and service plan around it.

Can my existing service support adding an ADU?+

That cannot be answered from the service rating alone: it depends on the existing and proposed loads together, the panel and service condition, and approved design options. A calculated load for both dwellings tells you whether the current service carries the addition or whether an upgrade belongs in the project.

When should the electrician join the ADU project?+

Before final equipment selection and before permit drawings, routes, and finished assemblies are fixed.

What electrical permits and approvals does an ADU need?+

An ADU typically involves electrical permitting and inspection alongside the broader construction, zoning, and utility steps, and the exact path depends on the scope and the City's current process. Confirm the requirements with Burlington and settle who files and schedules each one before work begins.

Does an ADU need its own panel and disconnect?+

A separate dwelling unit commonly needs its own distribution and a means of disconnect, and the specifics follow the layout and how it is fed from the service. The electrician designs the panel, feeder, and disconnect arrangement to the approved plan rather than to a rule of thumb.

How does utility coordination work for an ADU?+

Because an ADU can affect metering, service capacity, and the connection, the utility is part of the planning, not an afterthought. Bringing BED into the conversation early, alongside the electrician, avoids designing a panel and service arrangement that then has to change to meet the utility's requirements.